|
|
|
|
Daer sir,
we are thanking you a lot for your mail and cooperation
-we are a mining company based in D.R.Congo , we are the direct seller we do hope to deal with direct buyer also
we take pride to inform you that now in Tanzania we have 3000 M/T of copper cathodes ready for buyer personal inspection and immediately shipment
we are able to supply 5000 M/T to 10000 M/T every month a long term contract
we avoid to have a big quantity in Dar es salaam due to the storage charges
Our commodity;
1. Product: Copper Cathodes (Electrolytic Grade)
Min. Cu-purity: 99.99%
.Size: 914mm X 914mm X 12mm (appr.)(36” X 36” X 0.5)
Weight of each sheet: 125kgs +/- 1%
Net weight of each pallet: 2M/T +/- 1%
Min. weighs in each container: 20 M/T appr
Gross weight of each container: 22.2M/T appr.
Packing: palletized banded by aluminum bands
-country of origin: D.R.Congo
-loading port: Tanzania
-picture: up on request
-price: USD 3300 per M/T FOB Dar es Salaam
our procedure option 1:
1) Seller issue FCO.
2) Buyer issue LOI
3) Buyer sign stamp the FCO and send it back to us.
4) Seller sends the Contract draft to the buyer.
5) Buyer signs it, stamp it and send it back to us.
6) Seller sends to the buyer the Contract once more but as original copy on our company head letter via express mail. The buyer signs the two copies and sends us via express mail our copy. THE BUYER ISSUES A OPERATIVE LETTER OF CREDIT COMFIRMED IRREVOCABLE, UNTRANSFERIBLE 100% AT SIGHT.
7) The buyer visits the site to be sure of the good WILL PAY FOR THE FIRST SHIPMENT THE COST FROM DAR ES SALAAM TO FACILITATE THE TRANSPORATION, WHICH AMOUNT WILL BE DEDUCTED FROM THE VALUE OF THE GOODS. And to follow up their shipping.
8) After the End buyer visit the site and be sure of the goods.
9) We will do SGS before loading at seller cost
10) THE GOODS WILL BE SHIPPED
Procedure option 2:
1-The Buyer will pay only the cost of change of ownership in order to have the shipping document in buyer name AFTER the inspection of the goods and all necessary documents is done
2- The Seller will change the ownership to buyer issue the certificate in buyer name, pay the shipping cost and complete the shipment.
3- The Buyer will pay 10% of the value of the goods to the Seller at the LOADING Dock via T/T against the B/L.
4- The Buyer will pay 90% of the value of the goods 10 days after the arrival of the goods at destination by T/T or L/C against all set of the shipping documents
.inspection
we will do SGS at Dar es salaam at seller cost and we accept SGS or CIQ at destination at buyer cost
regards
Mr. KATUMBI Beya
|
|
|
|
|
Company : |
amck mining |
Email: |
Contact us |
URL: |
********
|
Phone: |
*********
|
Fax : |
*********
|
Country : |
|
Address : |
*********
|
|
|
|
|